The Birmingham New Street Christmas closure means no trains will run to, from or through the station from Thursday 24 to Monday 28 December 2026, while Network Rail starts a £13m overhead line renewal. Services are due to resume on Tuesday 29 December.
Key points
- No trains to, from or through Birmingham New Street from 24 to 28 December 2026 inclusive.
- A £13m, three-year overhead line programme starts, with £6.4m of track and points work at Soho Junction.
- The station building stays open, and services resume on 29 December 2026.
- This Black Friday weekend is expected to be one of the station’s busiest of the year.
When is the Birmingham New Street Christmas closure?
The closure runs from Thursday 24 December to Monday 28 December 2026 inclusive, with services planned to resume on Tuesday 29 December. Network Rail confirmed the dates in its Black Friday travel advice on 26 November 2026.
The station building will remain open, but journeys will take longer and may involve replacement buses or different routes. Network Rail points passengers to nationalrail.co.uk/newstreetclosure and to their train operator for the latest advice.
Why is Network Rail closing the station?
Network Rail is using the quiet days after Christmas to renew ageing overhead power lines. Rail Construction Today reported that the £13m programme runs over three years, with further work planned at Christmas 2027 and 2028, and that much of the wiring through New Street dates from the 1960s.
During the same closure, engineers will replace track and points at nearby Soho Junction as part of a £6.4m investment, covering 800 metres of track. Network Rail says doing both jobs together will minimise disruption. The closure is part of a £152m national Christmas engineering programme announced on 14 October 2026, which also includes London Paddington and Huddersfield.
Black Friday weekend at New Street
Before the closure, the station faces a very busy weekend. Network Rail says Black Friday shoppers and visitors to the Frankfurt Christmas Market, which runs until 24 December, mean this weekend is likely to be one of the busiest of the year at New Street.
Patrick Power, head of stations and passenger experience, asked passengers to check train times, give themselves plenty of time and not leave it until the last train. Queuing systems may be used at busy times to manage access to platforms. Network Rail said about 4.5 million passengers used New Street during the 2025 Christmas market period, according to Rail Construction Today.
What it means for you
If you plan to travel by rail over Christmas, check your journey now rather than on the day. On 27 and 28 December, London Northwestern Railway services from Euston will terminate and start at Birmingham International, according to Network Rail’s October release.
For this weekend, follow Network Rail’s three tips: plan ahead and check nationalrail.co.uk, know your last few trains home, and follow staff advice. Drivers heading into the city should also expect crowds around the market.
Start by deciding which days you need to travel, because 24 to 28 December is the only stretch with no trains through the station. Services are planned to resume on 29 December, but check the National Rail journey planner closer to the date, since engineering notices can change.
If you must travel during the closure, allow much more time. Network Rail says replacement buses or alternative routes may be used, so a journey that normally takes an hour could take considerably longer. Passengers who need help can call the Network Rail national helpline on 03457 11 41 41, and the station team will be on hand over the Black Friday weekend to give advice.
Drivers and coach users may prefer to avoid the city centre on the busiest days, while those meeting relatives at the station should remember that the building stays open even though no trains run. Leave plenty of time, travel light where you can, and tell friends and family about the changes so nobody turns up expecting a train that is not running.
Background
Network Rail first announced the closure on 22 September 2026. New Street is the busiest railway station outside London, and the Christmas work is the first phase of a long programme to improve reliability.
Elsewhere, Tube drivers have been striking in London, with further 24-hour strikes planned on 17 and 19 December 2026 and 4 and 6 January 2027, according to the BBC. For more local news, see our National section, including the Shard End by-election result and the Birmingham City Council commissioners story, and our Travel section for more.











